欧美大屁股xxxx,国产成人无码免费看片软件,国产小受呻吟GV视频在线观看 ,真人做人试看60分钟免费视频

濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.sud-inc.com/

地址:山東省濟南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 行業(yè)動態(tài)

鋼筋加工棚的8點安裝事項

來源:http://www.sud-inc.com/   發(fā)布時間:2023-02-17

鋼筋加工棚是施工現(xiàn)場鋼筋調(diào)直、彎曲和焊接的場所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對接,(不要擰14個螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個螺絲)。否則,支架的孔沒有對齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時,確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個2.99米鉆尾,鋼筋加工棚4個2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.sud-inc.com咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://www.sud-inc.com consulting service

久久精品中文字幕| の教室の成熟した女教师| 欧美性生交xxxxx无码小说 | 国产片xxxxa片国语对白| 国产SUV精二区| 女人脱精光让人桶爽了| 久久久精品人妻一区二区三区四区| 亚洲精品婷婷无码成人A片在线| 亚洲精品无码久久久影院相关影片 | 美女视频黄是免费| 欧美性XXXXX极品老少| 亚洲最大成人网| 三年片在线观看免费观看大全 | 久久久AV精品波多野结衣| 成人无码一区二区三区| 粗大老头让我欲仙欲死| 亚洲欧美婷婷五月色综合| 午夜无码A级毛片免费视频| 机长脔到她哭H粗话H| 日韩毛片无码永久免费看| 亲嘴脱内衣内裤摸屁股| 国产又粗又猛又黄又爽无遮挡| 狠狠色综合7777久夜色撩人| 国产香蕉九九久久精品免费| 97色情在线观看免费高清| 朝鲜肥女BBBWBBBWBBB| 久久伊人蜜桃AV一区二区| WWW色情成人免费视频软件| 日韩精品久久久久久久电影蜜臀 | 老熟妇小伙子HD另类| 被按摩的人妻中文字幕| 精品亚洲一区二区三区在线播放| 最近中文字幕在线中文一页| 成人网站在线观看| 小嫩模无套内谢第一次| 99久久精品国产一区二区三区| 出轨H客厅激情嗯啊呻吟| 性VIDEOSTV另类极品| 一边摸一边抽搐一进一出视频| 欧美人与善交大片免费看| 久久久国产精品无码一区二区三区 |